Scope of work and change orders in construction contracts

As contractor bidding on a construction project in North Carolina, you may expect many parties to be involved if you win the bid, including the owner, design team and subcontractors. Identifying exactly what each is responsible for allows you to avoid liability when someone else is at fault. This is where the construction contract comes in, and we at Triangle Law Group are skilled at negotiating these documents so that terms and clauses do not damage a client’s reputation and bottom line.

According to the American Bar Association, it is the scope or statement of work that will define the duties that you will perform as contractor. If you do not study the owner’s drawings and other design documents carefully, and later you discover that key areas for your performance are vague, it could lead to serious contract disputes. As a result, you may end up responsible for correcting the disparities to the detriment of your profits.

It is common for projects to adapt as new elements come up, whether they are owner requested changes, plan inconsistencies or some other issue that nobody anticipated. Any one of these, or all of them, could alter things so significantly, you are no longer completing the project you originally bid on. Adding a Change Order provision can prevent these from throwing you off track by setting up a process for making modifications. This could include specifications on how much notification you need and how to address disagreements between yourself and the owner, for example.

More information about innovative contract provisions and solutions is available on our webpage.

No Comments

Leave a comment
Comment Information

Learn How We Can Help

Bold labels are required.

Contact Information
disclaimer.

The use of the Internet or this form for communication with the firm or any individual member of the firm does not establish an attorney-client relationship. Confidential or time-sensitive information should not be sent through this form.

close

Privacy Policy

Email Us For A Response
Triangle Law Group

Triangle Law Group
3130 Fairhill Drive, Ste. 104
Raleigh, NC 27612

Toll Free: 877-427-1252
Phone: 919-301-0716
Phone: 919-848-1110
Phone: 919-301-0716
Fax: 919-848-1699
Map & Directions